Home » Inventory, Turbines

(1) Pratt & Whitney JT-3 Turbine

Item Number:
Make: Pratt & Whitney
Model: JT-3
Fuel Type: #2 Liquid Fuel
   
# Of Units: 1
MW Each 12.26
MW Total: 12.26
Voltage: 4,160
Hertz: 60
RPM:
$/kW:
   
Year:
Run Hours: 442
Rebuild Hours:
# Of Starts:
   
Unit Location: Canada
Unit Price: $1,700,000 USD
   
More Info:  

Configured to Run #2 Liquid Fuel Only
Can be modified to operate on Nat Gas or dual fuel for an additional fee
12.26 MW Peak Load
60 Hertz
4,160 Volts
442 Original Fired Hours on Package
With “0” Hr. Pratt & Whitney JT-3 Gas Turbine
& Brown-Boveri Expander Turbine
And With All Required Ancillary Equipment
Unit Price, (as described above) $ 1,700,000 USD
Unit location: Canada
Availability: 6 weeks ARO
Terms: 50% in advance, remaining 50% due prior to shipment
Warranty: All items installed, and work performed, 1 year from date of purchase.
50 Hz Conversion for an additional $105,000 USD

Alternator: BBC, 14000KVA, .8PF, Class B insulation, 4160VAC 60Hz, 3-Phase,
copper windings, open-type, air cooled.
Exciter: 88KW, 160V, Field Voltage: 125V, 260 Amps
Performance:
Operating 30 deg F @ 14.7Psia w/ .8 PF
14,000 KVA
Base Load: 8900KW, 14,850 BTU/KwHr
Peak Load: 12,260KW, 14,360 BTU/KwHr
Max Peak Load: 13,480KW, 14,300 BTU/KwHr
Fuel: Light Distillate, P&W Spec # 532, Naphtha, Kerosene
or Light Diesel, (#2)

Power Turbine:
No. of Stages: 1 impulse wheel
Blade Root Type: Firtree
Mean Diameter of Blades: 56"
Clear Height of Blades: 5' 5"
Tip Speed @ 3600RPM: 61,800FPM
Minimum Running Clearances: Axial: 5" Radial: 1"
Starter: Garrett Airesearch Jet Starting Turbine
Battery Bank: 125VDC, 510 Amp/Hr capacity
Possible Starts: Summer: 5, Winter: 3
System comes with all required accessories
Dimensions: 98' L x 10' W x 11' H
Roof Loading: 66 Lbs/SqFt
Heaviest Piece installation: Turbine Generator block: 150,000#
Heaviest Piece maintenance: 59,000# Generator Rotor
Turbine Rotor: 44,000#
Per Sales Agreement, unit will be completely cleaned & painted,
new control system installed, new inlet & exhaust ducting, and a zero-timed, fully rebuilt P&W JT-3 gas turbine installed

 

   

Additional Images: (click for larger size)